Vertical circulation three-dimensional parking lot project of Liaocheng Housing and Construction Bureau

Liaocheng Housing and Urban-Rural Development Bureau vertical circulation three-dimensional garage project, a total of two 20D garages and one 16DH garage will be built, with a total of 56 parking spaces, which will be completed and put into use in April 2023.
Case Details

聊城市住建局立体车库项目.jpg

Project Name: Liaocheng Housing and Construction Bureau Vertical Circulation Stereo Garage Project

Project location: Liaocheng Housing and Construction Bureau

A total of 2 20D garages and 1 16DH garage will be built, with a total of 56 parking spaces, which will be completed and put into use in April 2023.

Related Products

The transporter is an automatic vehicle transporting device in mechanical parking equipment. It has an independent movement device and can walk autonomously and complete the handover and transport of vehicles. The carrier's clamping system has four clamping arms. Through the wedge-shaped movement…

Popular products

Flat mobile three-dimensional garage
Single-layer AGV large plane movement Make full use of the plane space and use unmanned driving technology to achieve intensive safe and intelligent parking, with the number of parking spaces increasing by more than 40%. The single-layer large-plane mobile parking lot is mainly composed of
Vertical Lift Three-dimensional Garage
Application scenarios The vertical lift (large car) automatic parking system is a high-capacity three-dimensional garage that is more suitable for construction on the ground in modern cities. The garage structure is easier to combine with commerce, and the first and second floors of the garage can
Clamp-type parking robot
The transporter is an automatic vehicle transporting device in mechanical parking equipment. It has an independent movement device and can walk autonomously and complete the handover and transport of vehicles. The carrier's clamping system has four clamping arms. Through the wedge-shaped movement